What is the Requirements list in the Backend?
When you describe your app's backend, Furge AI first lists what you asked for, one requirement for each thing, then designs the blueprint. The Requirements tab shows where each one stands, checked by Furge against the blueprint, its tests and your database: Identified (not in the blueprint yet, and what's missing), Planned, Generated, Tested, Applied, Verified (checked on your live database after applying, with what Furge saw there), Failed (with the test that failed, or what your live database showed), Needs your answer (Furge asks instead of guessing) or Can't build yet (with why: emails, scheduled jobs, other services, pages and some kinds of rule aren't built by the backend yet). Nothing you asked for is dropped: a later request can replace a requirement, and the old one stays under Replaced. Furge's own security requirements are listed too, and What happened, in plain words sums it all up and copies.
Steps
- Turn on Developer at the top of the studio (or press Shift+D), open Backend, describe what you need and press Plan with Furge AI.
- Open Requirements: answer Furge's questions there, then press Plan with my answers.
- Read What happened, in plain words before you press Apply to database.
Also asked as
- requirements
- requirement list
- what i asked
- what furge understood
- needs your answer
- can't build yet
- why can't furge build this
- requirement status
- did furge do everything i asked
- furge skipped something
- answer furge's question
- plan with my answers
Related
Still stuck? Ask Furge Help, the round chat button at the bottom right, or contact the Furge team.